International Loadline Convention 1966-69-2005
Under the International Convention on Load Lines, 1966 (as modified by the 1988 Protocol), the tabular freeboard is only the starting value. The final assigned summer freeboard is obtained by applying prescribed corrections and deductions that reflect hull form, depth, reserve buoyancy, strength, weathertight integrity, and the amount of enclosed superstructure. imorules
Q1. Corrections to tabulated freeboard
Starting point
-
Determine the ship’s type:
- Type A: usually tankers with high inherent weathertight integrity, small deck openings and good subdivision.
- Type B: all ships that do not meet Type A conditions—most dry-cargo ships, container ships, bulk carriers and general-cargo ships.
-
From the appropriate Type A or Type B table, obtain the tabular freeboard corresponding to the convention length .
-
Apply the relevant corrections in the specified order.
A typical calculation sequence for a Type B ship is:
[ \boxed{ F_{\text{assigned}}
F_{\text{tabular}} \pm C_{L<100} \pm C_{C_B} \pm C_D \pm C_{\text{deck line}}
- D_{\text{superstructure/trunk}} \pm C_{\text{sheer}} } ]
Then verify:
and also check the separate minimum bow-height requirement.
Main corrections and their principles
| Correction / deduction | Effect on freeboard | Underlying principle |
|---|---|---|
| Correction for ships under 100 m | Usually increases Type B freeboard when the ship has little enclosed superstructure | A short dry-cargo ship with limited enclosed volume has less reserve buoyancy and is more affected by waves; it needs greater protection than the basic table alone provides |
| Block-coefficient correction | Increase if ; reduce if , subject to limits | A fuller ship has less buoyancy recovery as it heels or trims, greater exposure to green seas, and generally needs more reserve buoyancy. A finer ship has more favourable form characteristics and may receive a reduction |
| Depth correction | Increase where actual depth exceeds the tabular/reference depth; may reduce where it is less, within limits | Greater moulded depth gives more hull volume above the loaded waterline. The Convention gives credit for this reserve buoyancy, but only to a controlled extent and subject to minimum-freeboard rules |
| Correction for deck-line position | Adjusts freeboard if the deck line is not at the normal intersection of freeboard deck and shell | Freeboard is measured from the upper edge of the deck line. If the deck line is shifted from its normal datum, the numerical freeboard must be corrected so that the actual load line still represents the intended reserve buoyancy |
| Superstructure and trunk deduction | Reduces freeboard | Efficient enclosed superstructures and qualifying trunks create protected enclosed buoyancy above the freeboard deck, improve protection of deck openings, and reduce the likelihood of downflooding |
| Sheer correction | Excess sheer reduces freeboard; deficiency increases it | Sheer provides extra height, reserve buoyancy and protection at the ends, especially forward where green-sea boarding is severe. Deficient sheer removes this protection |
| Minimum bow-height check | May require an increase in freeboard or bow height | Adequate bow freeboard is needed to reduce deck wetness, green-water loading, hatch-cover damage and progressive flooding risk |
| Minimum freeboard check | Prevents excessive reduction | Regardless of deductions, the final assigned freeboard cannot be less than the Convention minimum applicable to the ship |
The Convention chapter on freeboards specifically includes corrections for ships under 100 m, block coefficient, depth, deck-line position, superstructures/trunks, sheer, minimum bow height and minimum freeboards. imorules
Block coefficient correction
The block coefficient is:
where:
- = moulded displacement volume,
- = Convention length,
- = moulded breadth,
- = relevant moulded draught.
For a Type B ship, the standard reference form is approximately:
The usual correction principle is:
Therefore:
- : add freeboard.
- : deduct freeboard, subject to the permitted maximum deduction.
A full-bodied bulk carrier, for example, normally attracts an increase because it is more vulnerable to deck immersion and may have less favourable reserve-buoyancy characteristics than a finer vessel.
Depth correction
The relevant depth is the freeboard depth, measured amidships from keel to the top of the freeboard deck beam at side, including the thickness of the freeboard deck at side where applicable. assets.publishing.service.gov
A deeper ship possesses more potential enclosed buoyancy above the assigned waterline. Thus, subject to Convention limits:
- Extra depth can justify a freeboard deduction.
- Inadequate depth requires an addition.
However, additional depth alone must not be used to claim unsafe reductions where the vessel lacks proper structural strength, effective enclosure, closing appliances, or adequate stability. The Convention expressly assumes adequate structural strength, stability and avoidance of excessive structural stress at the assigned draught. assets.publishing.service.gov
Superstructure deduction
An enclosed superstructure is valuable because it creates reserve buoyancy that remains available when the vessel is deeply laden or heeled.
The deduction depends principally on:
where:
- = total effective length of enclosed superstructures and qualifying trunks,
- = Convention length.
The more of the vessel’s length covered by effective enclosed superstructure, the greater the permitted deduction. If effective superstructure length equals the full ship length, the maximum applicable deduction is available; if it covers only part of the length, the deduction is proportionately smaller. laws-lois.justice.gc
Sheer correction
Sheer is treated separately because a raised deck line at the ends gives real safety benefit, especially in waves. The Convention correction is based on the difference between actual and standard sheer. A shortage of sheer generally increases freeboard; excess sheer may reduce it. assets.publishing.service.gov
Q2. Sheer: definition and calculation
Definition
Sheer is the longitudinal curvature of the freeboard deck measured at the ship’s side. It is the vertical distance between the actual deck line at side and a reference line drawn parallel to the keel through the sheer line amidships.
In simple terms:
- The deck is lowest around midships.
- It rises toward the bow and usually toward the stern.
- The upward rise is called sheer.
The Convention measures sheer from the deck at side to a reference line parallel to the keel through the amidship sheer line. assets.publishing.service.gov
Simple sketch
Actual freeboard-deck sheer line
Forward Aft
↑ ↑
| |
| |
____/ \_________________________________________/ \____
\ /
\_____________________________________________/
Reference line through midships
parallel to the keel
MidshipsAt midships:
At the ends, the vertical ordinate is at its maximum.
Standard sheer
For a normal ship, the standard sheer ordinates are expressed as fractions of .
| Position from nearest perpendicular | Standard sheer ordinate |
|---|---|
| At FP or AP | |
| At from FP or AP | |
| At from FP or AP | |
| Amidships |
Thus, standard end sheer is:
For example, if:
then:
So, at FP and AP, the standard freeboard-deck line is 3.0 m above the midship reference line.
Standard sheer sketch
Forward end Midships
Standard end ordinate = L/50
↑
│
│\
│ \
│ \
Reference line ____│___\_______________________________
FP L/6 L/3 0 at midships
Ordinate at FP = L/50
Ordinate at L/6 = L/150
Ordinate at L/3 = L/500
Ordinate amidships = 0The same method is used aft, but the aft standard sheer is generally smaller than forward standard sheer for conventional freeboard calculations. This reflects the greater exposure of the bow to head seas and green-water loads.
Method of calculating actual sheer
For a newly built ship, calculate sheer separately at the forward and aft halves.
Step 1: Establish the reference line
Draw a straight line parallel to the keel through the deck line at side amidships.
Freeboard deck at side
/
/
________________/___________________ Reference line
midshipsStep 2: Measure actual ordinates
At each side, measure the vertical distance from the reference line to the freeboard deck at:
- Forward perpendicular, FP.
- abaft FP.
- abaft FP.
- Amidships.
- forward of AP.
- forward of AP.
- After perpendicular, AP.
The midship ordinate is normally zero.
FORWARD HALF
FP L/6 L/3 Midships
|--------------|--------------|------------------|
↑ ↑ ↑ ↑
S1 S2 S3 0
Actual ordinates measured vertically from the
midship reference line to the deck at side.Step 3: Compare with standard ordinates
At every station, find:
[ \text{Difference}= \text{Actual sheer ordinate}
\text{Standard sheer ordinate} ]
- Positive result = excess sheer.
- Negative result = deficient sheer.
Step 4: Calculate the mean excess or deficiency
The ordinates are not simply averaged; they are combined by the Convention’s prescribed weighting method. The midship region has no sheer ordinate, and the end sections are given appropriate significance because the protection near the ends—especially forward—is most important.
For examination purposes, state:
The actual and standard ordinates at FP/AP, , and positions are compared. The excess or deficiency is integrated or weighted over the forward and aft halves in accordance with Regulation 38 to obtain the mean sheer excess or deficiency.
Step 5: Apply the correction
The Convention sheer correction is based on:
[ \text{Sheer correction}
(\text{mean deficiency or excess of sheer}) \times \text{applicable factor} ]
The factor depends upon the extent of effective enclosed superstructure. In the Convention text this is represented by a relationship involving the proportion of superstructure length; the correction reduces as the ship has more effective enclosed superstructure. assets.publishing.service.gov
Effect of superstructure on sheer credit
An enclosed superstructure itself provides reserve buoyancy and weather protection. Therefore, it may receive sheer credit if its actual height exceeds the standard superstructure height.
If a superstructure is higher than standard by :
- Add to the end sheer ordinate.
- Add at the station.
- Add at the station.
These increments are applied at the relevant end. lk.rs-class
Extra superstructure height = Z
At end: add Z
At L/6: add 0.444 Z
At L/3: add 0.111 Z
At midships: add 0How sheer improves safety and stability
Strictly speaking, sheer is primarily a reserve-buoyancy, seaworthiness and downflooding-protection feature rather than an initial-stability feature such as .
It contributes to safety in the following ways:
- Increases hull volume above the loaded waterline at the bow and stern.
- Increases reserve buoyancy as the end immerses due to waves, trim or heel.
- Improves longitudinal restoring characteristics in pitching and trimming.
- Reduces frequency of bow immersion and deck wetness.
- Helps protect hatch covers, vents, doors and deck machinery from green-water impacts.
- Reduces the likelihood of water accumulating in exposed wells or entering deck openings.
- Improves the residual buoyancy margin at the ends after limited flooding.
Low-sheer vessel Vessel with adequate sheer
Green water Green water
↓ ↓
________/\________ _________/\_________
/ \ / \
_______/____\_______ ______/______\_______
Low forward reserve Greater forward reserve
buoyancy; more wet deck buoyancy; better protectionThe key examination statement is:
Sheer does not usually create a large change in initial transverse , but it materially improves reserve buoyancy, the range of stability, resistance to deck immersion, longitudinal behaviour in waves, and protection against downflooding.
Limit on total deduction or addition
The assigned freeboard cannot be reduced without limit. The final value remains subject to:
- Minimum-freeboard provisions.
- Minimum bow-height requirements.
- Adequate strength and intact stability.
- Full compliance with the conditions of assignment: hatch closures, doors, ventilators, air pipes, freeing ports, guard rails, machinery-space protection, cargo ports and other opening protections.
The Convention allows a limited reduction from tabular freeboard when the vessel earns credit for favourable form, depth, enclosed superstructure, trunks and excess sheer; conversely, a vessel with unfavourable form, inadequate depth, deficient sheer or inadequate superstructure receives additions. The final assigned freeboard must never be below the prescribed minimum. imorules
Q3. Effective length of superstructure
Definition
The effective length of superstructure, denoted by , is the length of an enclosed superstructure that is accepted for freeboard-deduction purposes.
It may be less than the actual geometrical length , because the superstructure earns credit only to the extent that it provides meaningful enclosed buoyancy and weather protection.
Actual length of enclosed superstructure = S
┌──────────────────────────────────────────┐
│ Deckhouse / bridge │
──────┴──────────────────────────────────────────┴──────
<--------------- S ----------------------->
<----------- E ----------->
Effective length credited for freeboardFor an ordinary enclosed superstructure:
only where its height is at least the required standard superstructure height.
Standard superstructure height
The standard height is:
in metres, with Convention limits for long ships.
For example, for a 150 m ship:
So an enclosed 80 m bridge/deckhouse with an effective height of at least 2.30 m can usually receive full length credit:
Why effective length is used
The reason is that not all structures of equal plan length give equal reserve buoyancy.
A tall, fully enclosed, strongly built, weathertight superstructure:
- Adds real enclosed buoyancy.
- Remains effective when the vessel heels.
- Delays downflooding.
- Protects openings on the freeboard deck.
- Improves survivability in waves and damaged conditions.
A low or poorly enclosed deckhouse may provide less useful buoyancy and may be immersed or downflooded sooner. It should therefore not receive the same freeboard deduction.
High enclosed superstructure Low superstructure
┌───────────────┐ ┌───────────────┐
│ │ │ │
│ H ≥ Hs │ │ H < Hs │
──────┴───────────────┴────── ───┴───────────────┴───
Full buoyancy credit Partial buoyancy credit
E = S E < SDependence on superstructure height
Yes. The effective length depends directly on actual height if that height is below standard.
For an enclosed superstructure other than a raised quarterdeck:
where:
- = actual length,
- = actual least height at side,
- = standard superstructure height.
If:
then:
This proportional reduction is specifically reflected in load-line rules: if height is less than , effective length equals actual length multiplied by the ratio of actual height to standard height. laws-lois.justice.gc
Example: ordinary enclosed superstructure
Given:
First calculate standard height:
Because:
Although the actual deckhouse is 90 m long, only 70.4 m is credited in calculating the freeboard deduction.
Raised quarterdeck
A raised quarterdeck is treated more conservatively because it often has reduced height and a different contribution to reserve buoyancy. Its credit is limited; in typical Convention-form rules, the effective length is restricted to no more than , and height conditions are more restrictive than for an ordinary enclosed superstructure. laws-lois.justice.gc
Link to freeboard deduction
The total effective length enters the superstructure/trunk deduction through the ratio:
For example:
Small E/L → little protected buoyancy → small freeboard deduction
Large E/L → much protected buoyancy → larger freeboard deduction
E/L = 1 → maximum superstructure-related deductionFor a vessel where total effective enclosed-superstructure length equals the ship’s full Convention length, the maximum deduction is available. Where , the deduction is calculated from a reduced relation based on . laws-lois.justice.gc
Exam-ready summary
- Tabular freeboard is selected from the Type A or Type B table using Convention length.
- It is adjusted for: ship length below 100 m, block coefficient, depth, deck-line position, enclosed superstructures/trunks and sheer.
- It is then checked against the minimum freeboard and minimum bow-height requirements.
- Sheer is the rise of the freeboard deck at side from midships to the ends; it improves reserve buoyancy, reduces deck wetness and gives protection against green seas and downflooding.
- Excess sheer earns a deduction; deficient sheer requires an addition.
- Effective superstructure length is not necessarily the actual length: a low superstructure earns only proportionate credit because it supplies less protected buoyancy.
- For a normal enclosed superstructure below standard height:
- The greater the effective length , the greater the permitted deduction from tabular freeboard—subject always to minimum safety limits.