Risk Control Options (RCOs)

Contents

  1. Probability reducing RCO’s: Land-based salety systems’ passive systems (Fairways,lights, TSS) -
  2. Active systems (pilotage, VTS) -
  3. On-board safety’ systems
  4. Alert systems -
  5. Observation systems
  6. Communication equipment
  7. Measures to influence subjective behavior
  8. Legal sources
  9. IMO instruments (conventions. ISM. ISPS) 10.National legislation 11.Training